The Pepperpot Building
Commercial building
Location: Sheffield
Contract Value: 170,000
Contract Duration: 12 months
Facade retention scaffold to a 19th Century Building known as The Pepperpot located in Sheffield. The scaffolding to this Grade 1 listed building was carried out in tube and fitting which took us 8 weeks to erect. A complex scaffold design for this project was required for a free standing scaffold which required 200 tonne of kentledge on base due to the footpath not being able to withstand the scaffold bearing pressure. Design required for us to insert steel high beams at 1m centres to the perimeter of the building.